Well-rig rental
Crawler rig with an operator — we arrive, drill with the mud / flush method, and prepare a quote for your plot.
What the quote includes
Rig with operator
Drilling
Casing and accessories — agreed with the quote
What you get
Crawler rig rental for deep water wells with an operator. They arrive with the machine and complete the borehole — you do not have to operate the equipment.
Who it is for
For investors and companies that need a water-well hole and do not want to buy a rig or drill themselves. You do not need experience — the operator arrives with the machine.
Scope of holes
Deep-well drilling with the mud / flush method — proven on clays, silts and difficult ground. The operator arrives with a crawler rig and completes the borehole on your plot.
- Water wells for homes, buildings and developments
- Depth to approx. 80–100 m — depending on model and ground conditions
- Mud / flush method effective on clays, silts and difficult terrain
- Hole diameter, casing and accessories — agreed in the individual quote
- All field work by the operator — you do not operate the machine
Service area
Travel and timing are agreed after contact. Cost depends on plot location, hole depth and access conditions.
- Jobs after prior contact and an accepted quote
- Travel is included in the offer — price depends on distance and route
- Before arrival we agree plot access and where to set up the rig
- We align the date with the job queue and on-site conditions
- Send the town or full address — we will call back with a quote
-
Contact
You describe location, planned depth and the site.
-
Quote
We prepare an individual quote.
-
Date
After acceptance we align the schedule.
-
Arrival and drilling
The operator arrives with the rig and completes the hole.
The machine at work
Ask about rental →Questions about rental with an operator
No — an operator always goes with the rig and drills the hole. The machine without a crew is not available.
Included: travel, rig with operator and drilling. Casing and accessories are added in the quote, because they depend on the hole.
Approx. 80–100 m depending on model and conditions. Details in the quote.
After contact and quote we set a date that fits the plot and the job queue.
No. The operator arrives, sets up the machine and completes the borehole.